{"id":6083,"date":"2026-04-07T06:24:45","date_gmt":"2026-04-07T06:24:45","guid":{"rendered":"https:\/\/mouldzone.com\/blog\/?p=6083"},"modified":"2026-04-07T06:28:23","modified_gmt":"2026-04-07T06:28:23","slug":"tool-qualification-iq-oq-pq-in-medical-moulds","status":"publish","type":"post","link":"https:\/\/mouldzone.com\/blog\/tool-qualification-iq-oq-pq-in-medical-moulds\/","title":{"rendered":"Tool Qualification (IQ, OQ, PQ) in Medical Moulds"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"6083\" class=\"elementor elementor-6083\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8a530d9 e-flex e-con-boxed e-con e-parent\" data-id=\"8a530d9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-728af75 elementor-widget elementor-widget-text-editor\" data-id=\"728af75\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"116\" data-end=\"458\">Tool qualification is a critical requirement in medical injection moulding to ensure that moulds consistently produce parts meeting stringent regulatory, safety, and quality standards. The qualification process follows three main stages: <strong data-start=\"354\" data-end=\"457\">Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ)<\/strong>.<\/p><hr data-start=\"460\" data-end=\"463\" \/><h3 data-section-id=\"bw3ipa\" data-start=\"465\" data-end=\"525\"><span role=\"text\"><strong data-start=\"468\" data-end=\"525\">1. Importance of Tool Qualification in Medical Moulds<\/strong><\/span><\/h3><p data-start=\"527\" data-end=\"724\">Medical components are used in sensitive applications such as surgical devices, drug delivery systems, and diagnostic equipment. Any variation can lead to serious risks. Tool qualification ensures:<\/p><ul data-start=\"726\" data-end=\"928\"><li data-section-id=\"1att4rr\" data-start=\"726\" data-end=\"781\">Compliance with regulatory standards (FDA, ISO 13485)<\/li><li data-section-id=\"vv4pto\" data-start=\"782\" data-end=\"827\">Repeatability and consistency in production<\/li><li data-section-id=\"o9lfw\" data-start=\"828\" data-end=\"864\">Risk mitigation and patient safety<\/li><li data-section-id=\"1ifjvrm\" data-start=\"865\" data-end=\"897\">Traceability and documentation<\/li><li data-section-id=\"44pcbc\" data-start=\"898\" data-end=\"928\">Process validation readiness<\/li><\/ul><hr data-start=\"930\" data-end=\"933\" \/><h3 data-section-id=\"1spx5u5\" data-start=\"935\" data-end=\"976\"><span role=\"text\"><strong data-start=\"938\" data-end=\"976\">2. Installation Qualification (IQ)<\/strong><\/span><\/h3><h3 data-section-id=\"1pwidkj\" data-start=\"978\" data-end=\"996\"><span role=\"text\"><strong data-start=\"982\" data-end=\"996\">Objective:<\/strong><\/span><\/h3><p data-start=\"997\" data-end=\"1100\">To verify that the mould and associated systems are installed correctly and meet design specifications.<\/p><h3 data-section-id=\"11h3s68\" data-start=\"1102\" data-end=\"1125\"><span role=\"text\"><strong data-start=\"1106\" data-end=\"1125\">Key Activities:<\/strong><\/span><\/h3><ul data-start=\"1127\" data-end=\"1487\"><li data-section-id=\"1j14w22\" data-start=\"1127\" data-end=\"1183\">Verification of mould design against approved drawings<\/li><li data-section-id=\"1g649iy\" data-start=\"1184\" data-end=\"1241\">Checking material certifications (tool steel, coatings)<\/li><li data-section-id=\"kq5oos\" data-start=\"1242\" data-end=\"1310\">Inspection of mould components (cavities, cores, cooling channels)<\/li><li data-section-id=\"17nbx6a\" data-start=\"1311\" data-end=\"1382\">Machine compatibility verification (tonnage, platen size, interfaces)<\/li><li data-section-id=\"1g9j4q5\" data-start=\"1383\" data-end=\"1448\">Utility checks (cooling lines, hot runner connections, sensors)<\/li><li data-section-id=\"9k2l5c\" data-start=\"1449\" data-end=\"1487\">Calibration of measuring instruments<\/li><\/ul><h3 data-section-id=\"1lufa5q\" data-start=\"1489\" data-end=\"1511\"><span role=\"text\"><strong data-start=\"1493\" data-end=\"1511\">Documentation:<\/strong><\/span><\/h3><ul data-start=\"1513\" data-end=\"1622\"><li data-section-id=\"1rd9j7t\" data-start=\"1513\" data-end=\"1540\">IQ protocol and checklist<\/li><li data-section-id=\"1pceoee\" data-start=\"1541\" data-end=\"1577\">Equipment manuals and certificates<\/li><li data-section-id=\"11m2ki2\" data-start=\"1578\" data-end=\"1600\">Installation records<\/li><li data-section-id=\"1xxxj4v\" data-start=\"1601\" data-end=\"1622\">Calibration reports<\/li><\/ul><h3 data-section-id=\"flnh06\" data-start=\"1624\" data-end=\"1640\"><span role=\"text\"><strong data-start=\"1628\" data-end=\"1640\">Outcome:<\/strong><\/span><\/h3><p data-start=\"1641\" data-end=\"1726\">Confirmation that the mould is correctly installed and ready for operational testing.<\/p><hr data-start=\"1728\" data-end=\"1731\" \/><h3 data-section-id=\"9nz34e\" data-start=\"1733\" data-end=\"1773\"><span role=\"text\"><strong data-start=\"1736\" data-end=\"1773\">3. Operational Qualification (OQ)<\/strong><\/span><\/h3><h3 data-section-id=\"1pwidkj\" data-start=\"1775\" data-end=\"1793\"><span role=\"text\"><strong data-start=\"1779\" data-end=\"1793\">Objective:<\/strong><\/span><\/h3><p data-start=\"1794\" data-end=\"1879\">To establish and verify the optimal operating parameters under controlled conditions.<\/p><h3 data-section-id=\"11h3s68\" data-start=\"1881\" data-end=\"1904\"><span role=\"text\"><strong data-start=\"1885\" data-end=\"1904\">Key Activities:<\/strong><\/span><\/h3><ul data-start=\"1906\" data-end=\"2258\"><li data-section-id=\"1mpj2sy\" data-start=\"1906\" data-end=\"2014\">Process parameter development:<ul data-start=\"1941\" data-end=\"2014\"><li data-section-id=\"1u1wji2\" data-start=\"1941\" data-end=\"1961\">Injection pressure<\/li><li data-section-id=\"1x9sk5w\" data-start=\"1964\" data-end=\"1982\">Melt temperature<\/li><li data-section-id=\"1unc8fm\" data-start=\"1985\" data-end=\"1999\">Cooling time<\/li><li data-section-id=\"1vpmuod\" data-start=\"2002\" data-end=\"2014\">Cycle time<\/li><\/ul><\/li><li data-section-id=\"8tailx\" data-start=\"2015\" data-end=\"2072\">Design of Experiments (DOE) to determine process limits<\/li><li data-section-id=\"6k6zav\" data-start=\"2073\" data-end=\"2118\">Short-shot studies to evaluate fill balance<\/li><li data-section-id=\"xbj3hq\" data-start=\"2119\" data-end=\"2163\">Gate freeze and cooling efficiency studies<\/li><li data-section-id=\"1wd33hc\" data-start=\"2164\" data-end=\"2218\">Identification of critical process parameters (CPPs)<\/li><li data-section-id=\"iqmazv\" data-start=\"2219\" data-end=\"2258\">Alarm and control system verification<\/li><\/ul><h3 data-section-id=\"e1cfja\" data-start=\"2260\" data-end=\"2282\"><span role=\"text\"><strong data-start=\"2264\" data-end=\"2282\">Testing Focus:<\/strong><\/span><\/h3><ul data-start=\"2284\" data-end=\"2409\"><li data-section-id=\"164a663\" data-start=\"2284\" data-end=\"2309\">Dimensional consistency<\/li><li data-section-id=\"1le11m\" data-start=\"2310\" data-end=\"2353\">Visual defects (flash, sink marks, burns)<\/li><li data-section-id=\"xsoyl\" data-start=\"2354\" data-end=\"2378\">Material flow behavior<\/li><li data-section-id=\"v8xtcy\" data-start=\"2379\" data-end=\"2409\">Process window establishment<\/li><\/ul><h3 data-section-id=\"1lufa5q\" data-start=\"2411\" data-end=\"2433\"><span role=\"text\"><strong data-start=\"2415\" data-end=\"2433\">Documentation:<\/strong><\/span><\/h3><ul data-start=\"2435\" data-end=\"2522\"><li data-section-id=\"184u7fp\" data-start=\"2435\" data-end=\"2461\">OQ protocols and reports<\/li><li data-section-id=\"42jcrg\" data-start=\"2462\" data-end=\"2475\">DOE results<\/li><li data-section-id=\"vbrkph\" data-start=\"2476\" data-end=\"2502\">Process parameter charts<\/li><li data-section-id=\"1f8vbdh\" data-start=\"2503\" data-end=\"2522\">Deviation records<\/li><\/ul><h3 data-section-id=\"flnh06\" data-start=\"2524\" data-end=\"2540\"><span role=\"text\"><strong data-start=\"2528\" data-end=\"2540\">Outcome:<\/strong><\/span><\/h3><p data-start=\"2541\" data-end=\"2615\">Defined and validated operating range ensuring stable moulding conditions.<\/p><hr data-start=\"2617\" data-end=\"2620\" \/><h3 data-section-id=\"1nsb8ja\" data-start=\"2622\" data-end=\"2662\"><span role=\"text\"><strong data-start=\"2625\" data-end=\"2662\">4. Performance Qualification (PQ)<\/strong><\/span><\/h3><h3 data-section-id=\"1pwidkj\" data-start=\"2664\" data-end=\"2682\"><span role=\"text\"><strong data-start=\"2668\" data-end=\"2682\">Objective:<\/strong><\/span><\/h3><p data-start=\"2683\" data-end=\"2778\">To demonstrate that the mould performs consistently under real production conditions over time.<\/p><h3 data-section-id=\"11h3s68\" data-start=\"2780\" data-end=\"2803\"><span role=\"text\"><strong data-start=\"2784\" data-end=\"2803\">Key Activities:<\/strong><\/span><\/h3><ul data-start=\"2805\" data-end=\"3038\"><li data-section-id=\"pn7srh\" data-start=\"2805\" data-end=\"2868\">Running the mould at nominal settings (established during OQ)<\/li><li data-section-id=\"12diwst\" data-start=\"2869\" data-end=\"2930\">Extended production runs (e.g., multiple batches or shifts)<\/li><li data-section-id=\"145dmr7\" data-start=\"2931\" data-end=\"2962\">Sampling at defined intervals<\/li><li data-section-id=\"17gjjbg\" data-start=\"2963\" data-end=\"3007\">Statistical process control (SPC) analysis<\/li><li data-section-id=\"1a1qad3\" data-start=\"3008\" data-end=\"3038\">Capability studies (Cp, Cpk)<\/li><\/ul><h3 data-section-id=\"e1cfja\" data-start=\"3040\" data-end=\"3062\"><span role=\"text\"><strong data-start=\"3044\" data-end=\"3062\">Testing Focus:<\/strong><\/span><\/h3><ul data-start=\"3064\" data-end=\"3194\"><li data-section-id=\"1k9ez0d\" data-start=\"3064\" data-end=\"3090\">Part-to-part consistency<\/li><li data-section-id=\"kn587t\" data-start=\"3091\" data-end=\"3124\">Long-term dimensional stability<\/li><li data-section-id=\"m9bg1e\" data-start=\"3125\" data-end=\"3158\">Functional performance of parts<\/li><li data-section-id=\"24dgqx\" data-start=\"3159\" data-end=\"3194\">Scrap rate and process capability<\/li><\/ul><h3 data-section-id=\"1lufa5q\" data-start=\"3196\" data-end=\"3218\"><span role=\"text\"><strong data-start=\"3200\" data-end=\"3218\">Documentation:<\/strong><\/span><\/h3><ul data-start=\"3220\" data-end=\"3315\"><li data-section-id=\"d1isgo\" data-start=\"3220\" data-end=\"3255\">PQ protocol and execution records<\/li><li data-section-id=\"1n8w58r\" data-start=\"3256\" data-end=\"3276\">Inspection reports<\/li><li data-section-id=\"1lzlqaf\" data-start=\"3277\" data-end=\"3289\">SPC charts<\/li><li data-section-id=\"8dcdnl\" data-start=\"3290\" data-end=\"3315\">Final validation report<\/li><\/ul><h3 data-section-id=\"flnh06\" data-start=\"3317\" data-end=\"3333\"><span role=\"text\"><strong data-start=\"3321\" data-end=\"3333\">Outcome:<\/strong><\/span><\/h3><p data-start=\"3334\" data-end=\"3419\">Evidence that the mould consistently produces acceptable parts in routine production.<\/p><hr data-start=\"3421\" data-end=\"3424\" \/><h3 data-section-id=\"1m1zlf1\" data-start=\"3426\" data-end=\"3486\"><span role=\"text\"><strong data-start=\"3429\" data-end=\"3486\">5. Critical Parameters in Medical Mould Qualification<\/strong><\/span><\/h3><ul data-start=\"3488\" data-end=\"3668\"><li data-section-id=\"hx2uuy\" data-start=\"3488\" data-end=\"3521\">Cavity pressure and temperature<\/li><li data-section-id=\"65fg4b\" data-start=\"3522\" data-end=\"3557\">Cooling efficiency and uniformity<\/li><li data-section-id=\"1l5pkqh\" data-start=\"3558\" data-end=\"3579\">Venting performance<\/li><li data-section-id=\"1li4ks\" data-start=\"3580\" data-end=\"3608\">Material drying conditions<\/li><li data-section-id=\"1lb3825\" data-start=\"3609\" data-end=\"3630\">Cycle repeatability<\/li><li data-section-id=\"u2i57v\" data-start=\"3631\" data-end=\"3668\">Tool wear and maintenance intervals<\/li><\/ul><hr data-start=\"3670\" data-end=\"3673\" \/><h3 data-section-id=\"dz3m57\" data-start=\"3675\" data-end=\"3715\"><span role=\"text\"><strong data-start=\"3678\" data-end=\"3715\">6. Risk Management and Compliance<\/strong><\/span><\/h3><p data-start=\"3717\" data-end=\"3778\">Tool qualification is aligned with risk management practices:<\/p><ul data-start=\"3780\" data-end=\"4026\"><li data-section-id=\"1hd4xjb\" data-start=\"3780\" data-end=\"3858\"><strong data-start=\"3782\" data-end=\"3826\">Failure Mode and Effects Analysis (FMEA)<\/strong> for identifying potential risks<\/li><li data-section-id=\"mqvvnx\" data-start=\"3859\" data-end=\"3972\">Compliance with:<ul data-start=\"3880\" data-end=\"3972\"><li data-section-id=\"ov5eq7\" data-start=\"3880\" data-end=\"3920\">ISO 13485 (Quality Management Systems)<\/li><li data-section-id=\"1s8y3n3\" data-start=\"3923\" data-end=\"3972\">FDA 21 CFR Part 820 (Quality System Regulation)<\/li><\/ul><\/li><li data-section-id=\"1c3bm8s\" data-start=\"3973\" data-end=\"4026\">Change control procedures for any tool modification<\/li><\/ul><hr data-start=\"4028\" data-end=\"4031\" \/><h3 data-section-id=\"1rzg5ty\" data-start=\"4033\" data-end=\"4073\"><span role=\"text\"><strong data-start=\"4036\" data-end=\"4073\">7. Documentation and Traceability<\/strong><\/span><\/h3><p data-start=\"4075\" data-end=\"4147\">Complete documentation is essential for audits and regulatory approvals:<\/p><ul data-start=\"4149\" data-end=\"4304\"><li data-section-id=\"icjvay\" data-start=\"4149\" data-end=\"4187\">Qualification protocols (IQ, OQ, PQ)<\/li><li data-section-id=\"1lk8ktg\" data-start=\"4188\" data-end=\"4215\">Raw material traceability<\/li><li data-section-id=\"12zxi3e\" data-start=\"4216\" data-end=\"4239\">Tool maintenance logs<\/li><li data-section-id=\"xz08fm\" data-start=\"4240\" data-end=\"4268\">Validation summary reports<\/li><li data-section-id=\"2lknn3\" data-start=\"4269\" data-end=\"4304\">Batch records and inspection data<\/li><\/ul><hr data-start=\"4306\" data-end=\"4309\" \/><h3 data-section-id=\"bssruo\" data-start=\"4311\" data-end=\"4360\"><span role=\"text\"><strong data-start=\"4314\" data-end=\"4360\">8. Common Challenges in Tool Qualification<\/strong><\/span><\/h3><ul data-start=\"4362\" data-end=\"4569\"><li data-section-id=\"96o8d7\" data-start=\"4362\" data-end=\"4417\">Inconsistent cooling leading to dimensional variation<\/li><li data-section-id=\"12nqmo6\" data-start=\"4418\" data-end=\"4455\">Improper venting causing burn marks<\/li><li data-section-id=\"13yngxc\" data-start=\"4456\" data-end=\"4506\">Material variability affecting process stability<\/li><li data-section-id=\"1u6arie\" data-start=\"4507\" data-end=\"4542\">Tool wear impacting repeatability<\/li><li data-section-id=\"88muh4\" data-start=\"4543\" data-end=\"4569\">Inadequate DOE during OQ<\/li><\/ul><hr data-start=\"4571\" data-end=\"4574\" \/><h3 data-section-id=\"13urxoa\" data-start=\"4576\" data-end=\"4600\"><span role=\"text\"><strong data-start=\"4579\" data-end=\"4600\">9. Best Practices<\/strong><\/span><\/h3><ul data-start=\"4602\" data-end=\"4934\"><li data-section-id=\"18yt94n\" data-start=\"4602\" data-end=\"4654\">Use high-precision tooling and validated materials<\/li><li data-section-id=\"15splo8\" data-start=\"4655\" data-end=\"4713\">Implement real-time monitoring (cavity pressure sensors)<\/li><li data-section-id=\"6bm2qz\" data-start=\"4714\" data-end=\"4746\">Conduct thorough DOE during OQ<\/li><li data-section-id=\"a1nq4r\" data-start=\"4747\" data-end=\"4811\">Maintain strict environmental controls (cleanroom if required)<\/li><li data-section-id=\"16201i\" data-start=\"4812\" data-end=\"4864\">Regular preventive maintenance and requalification<\/li><li data-section-id=\"1t7id5o\" data-start=\"4865\" data-end=\"4934\">Ensure cross-functional collaboration (design, quality, production)<\/li><\/ul><hr data-start=\"4936\" data-end=\"4939\" \/><h3 data-section-id=\"9dt57q\" data-start=\"4941\" data-end=\"4958\"><span role=\"text\"><strong data-start=\"4944\" data-end=\"4958\">Conclusion<\/strong><\/span><\/h3><p data-start=\"4960\" data-end=\"5267\">Tool Qualification (IQ, OQ, PQ) in medical moulds is a structured approach to ensure that moulds are properly installed, operate within defined parameters, and consistently produce high-quality medical components. It plays a vital role in regulatory compliance, patient safety, and manufacturing excellence.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e99e340 e-flex e-con-boxed e-con e-parent\" data-id=\"e99e340\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-211466e elementor-widget elementor-widget-image\" data-id=\"211466e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/33-1024x576.png\" class=\"attachment-large size-large wp-image-6085\" alt=\"\" srcset=\"https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/33-1024x576.png 1024w, https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/33-300x169.png 300w, https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/33-768x432.png 768w, https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/33.png 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Tool qualification is a critical requirement in medical injection moulding to ensure that moulds consistently produce parts meeting stringent regulatory, safety, and quality standards. The qualification process follows three main stages: Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ). 1. Importance of Tool Qualification in Medical Moulds Medical components are used in sensitive [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6085,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-other"],"_links":{"self":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts\/6083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/comments?post=6083"}],"version-history":[{"count":4,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts\/6083\/revisions"}],"predecessor-version":[{"id":6088,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts\/6083\/revisions\/6088"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/media\/6085"}],"wp:attachment":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/media?parent=6083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/categories?post=6083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/tags?post=6083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}