{"id":6096,"date":"2026-04-09T08:16:13","date_gmt":"2026-04-09T08:16:13","guid":{"rendered":"https:\/\/mouldzone.com\/blog\/?p=6096"},"modified":"2026-04-09T08:25:29","modified_gmt":"2026-04-09T08:25:29","slug":"cost-estimation-for-cosmetic-mould-manufacturing","status":"publish","type":"post","link":"https:\/\/mouldzone.com\/blog\/cost-estimation-for-cosmetic-mould-manufacturing\/","title":{"rendered":"Cost Estimation for Cosmetic Mould Manufacturing"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"6096\" class=\"elementor elementor-6096\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5d65c45 e-flex e-con-boxed e-con e-parent\" data-id=\"5d65c45\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5d7c1a2 elementor-widget elementor-widget-text-editor\" data-id=\"5d7c1a2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"124\" data-end=\"380\">Cost estimation is a critical phase in cosmetic mould manufacturing, as it directly impacts pricing, profitability, and project feasibility. Accurate estimation ensures efficient resource allocation, competitive quotations, and controlled production costs.<\/p><hr data-start=\"382\" data-end=\"385\" \/><h3 data-section-id=\"w2rnt4\" data-start=\"387\" data-end=\"430\"><span role=\"text\"><strong data-start=\"390\" data-end=\"430\">1. Key Components of Cost Estimation<\/strong><\/span><\/h3><h3 data-section-id=\"w2wn3l\" data-start=\"432\" data-end=\"471\"><span role=\"text\"><strong data-start=\"436\" data-end=\"471\">a. Design and Engineering Costs<\/strong><\/span><\/h3><ul data-start=\"472\" data-end=\"676\"><li data-section-id=\"2z6rj0\" data-start=\"472\" data-end=\"521\">Product design analysis and feasibility study<\/li><li data-section-id=\"eixun6\" data-start=\"522\" data-end=\"558\">3D modelling and CAD development<\/li><li data-section-id=\"ihqps7\" data-start=\"559\" data-end=\"637\">Mold flow analysis (to predict defects like warpage, shrinkage, air traps)<\/li><li data-section-id=\"e3u6p4\" data-start=\"638\" data-end=\"676\">Design modifications and approvals<\/li><\/ul><h3 data-section-id=\"1s4qdzx\" data-start=\"678\" data-end=\"707\"><span role=\"text\"><strong data-start=\"682\" data-end=\"707\">b. Raw Material Costs<\/strong><\/span><\/h3><ul data-start=\"708\" data-end=\"900\"><li data-section-id=\"1he7xz\" data-start=\"708\" data-end=\"785\">Tool steel (e.g., P20, H13, stainless steel for high polish requirements)<\/li><li data-section-id=\"1s5f2r3\" data-start=\"786\" data-end=\"869\">Standard components (ejector pins, guide pillars, bushings, hot runner systems)<\/li><li data-section-id=\"yfmksk\" data-start=\"870\" data-end=\"900\">Inserts and core materials<\/li><\/ul><p data-start=\"902\" data-end=\"964\">Material selection significantly influences cost depending on:<\/p><ul data-start=\"965\" data-end=\"1105\"><li data-section-id=\"141kbsv\" data-start=\"965\" data-end=\"1031\">Surface finish requirements (mirror finish for cosmetic parts)<\/li><li data-section-id=\"2a3vdb\" data-start=\"1032\" data-end=\"1055\">Expected mould life<\/li><li data-section-id=\"1y010hp\" data-start=\"1056\" data-end=\"1105\">Corrosion resistance (for aggressive materials)<\/li><\/ul><hr data-start=\"1107\" data-end=\"1110\" \/><h3 data-section-id=\"zatxfc\" data-start=\"1112\" data-end=\"1156\"><span role=\"text\"><strong data-start=\"1116\" data-end=\"1156\">c. Machining and Manufacturing Costs<\/strong><\/span><\/h3><ul data-start=\"1157\" data-end=\"1303\"><li data-section-id=\"1q4t612\" data-start=\"1157\" data-end=\"1174\">CNC machining<\/li><li data-section-id=\"1kxl6mn\" data-start=\"1175\" data-end=\"1215\">EDM (Electrical Discharge Machining)<\/li><li data-section-id=\"udzgif\" data-start=\"1216\" data-end=\"1232\">Wire cutting<\/li><li data-section-id=\"yww9tk\" data-start=\"1233\" data-end=\"1303\">Grinding and polishing (especially critical for cosmetic finishes)<\/li><\/ul><p data-start=\"1305\" data-end=\"1370\">High-gloss or textured surfaces increase machining time and cost.<\/p><hr data-start=\"1372\" data-end=\"1375\" \/><h3 data-section-id=\"h9rtke\" data-start=\"1377\" data-end=\"1414\"><span role=\"text\"><strong data-start=\"1381\" data-end=\"1414\">d. Assembly and Fitting Costs<\/strong><\/span><\/h3><ul data-start=\"1415\" data-end=\"1534\"><li data-section-id=\"bob14t\" data-start=\"1415\" data-end=\"1447\">Mould assembly and alignment<\/li><li data-section-id=\"8lbkru\" data-start=\"1448\" data-end=\"1482\">Manual fitting and adjustments<\/li><li data-section-id=\"1ol469n\" data-start=\"1483\" data-end=\"1534\">Integration of cooling channels and hot runners<\/li><\/ul><hr data-start=\"1536\" data-end=\"1539\" \/><h3 data-section-id=\"4xzar7\" data-start=\"1541\" data-end=\"1575\"><span role=\"text\"><strong data-start=\"1545\" data-end=\"1575\">e. Surface Finishing Costs<\/strong><\/span><\/h3><ul data-start=\"1576\" data-end=\"1692\"><li data-section-id=\"19of3i7\" data-start=\"1576\" data-end=\"1616\">Mirror polishing for aesthetic parts<\/li><li data-section-id=\"19ynws6\" data-start=\"1617\" data-end=\"1659\">Texturing (matte, leather grain, etc.)<\/li><li data-section-id=\"qnzbiz\" data-start=\"1660\" data-end=\"1692\">Coatings for wear resistance<\/li><\/ul><p data-start=\"1694\" data-end=\"1781\">This is a major cost driver in cosmetic moulds due to high visual quality requirements.<\/p><hr data-start=\"1783\" data-end=\"1786\" \/><h3 data-section-id=\"6vqfis\" data-start=\"1788\" data-end=\"1825\"><span role=\"text\"><strong data-start=\"1792\" data-end=\"1825\">f. Trial and Validation Costs<\/strong><\/span><\/h3><ul data-start=\"1826\" data-end=\"1921\"><li data-section-id=\"jvb4av\" data-start=\"1826\" data-end=\"1860\">Trial runs (T0, T1, T2 trials)<\/li><li data-section-id=\"vfs1a6\" data-start=\"1861\" data-end=\"1888\">Sampling and inspection<\/li><li data-section-id=\"m41cwm\" data-start=\"1889\" data-end=\"1921\">Defect correction and rework<\/li><\/ul><p data-start=\"1923\" data-end=\"1965\">Multiple iterations increase overall cost.<\/p><hr data-start=\"1967\" data-end=\"1970\" \/><h3 data-section-id=\"1vr2r68\" data-start=\"1972\" data-end=\"2013\"><span role=\"text\"><strong data-start=\"1976\" data-end=\"2013\">g. Quality Control and Inspection<\/strong><\/span><\/h3><ul data-start=\"2014\" data-end=\"2113\"><li data-section-id=\"ybl79j\" data-start=\"2014\" data-end=\"2054\">Dimensional inspection (CMM, gauges)<\/li><li data-section-id=\"kdbiit\" data-start=\"2055\" data-end=\"2081\">Surface quality checks<\/li><li data-section-id=\"1aa82v3\" data-start=\"2082\" data-end=\"2113\">Documentation and reporting<\/li><\/ul><hr data-start=\"2115\" data-end=\"2118\" \/><h3 data-section-id=\"194lafe\" data-start=\"2120\" data-end=\"2159\"><span role=\"text\"><strong data-start=\"2124\" data-end=\"2159\">h. Packaging and Transportation<\/strong><\/span><\/h3><ul data-start=\"2160\" data-end=\"2223\"><li data-section-id=\"147ihqb\" data-start=\"2160\" data-end=\"2188\">Safe packaging of moulds<\/li><li data-section-id=\"17n6jd7\" data-start=\"2189\" data-end=\"2223\">Logistics and shipping charges<\/li><\/ul><hr data-start=\"2225\" data-end=\"2228\" \/><h3 data-section-id=\"117s118\" data-start=\"2230\" data-end=\"2264\"><span role=\"text\"><strong data-start=\"2233\" data-end=\"2264\">2. Factors Influencing Cost<\/strong><\/span><\/h3><h3 data-section-id=\"yitxeu\" data-start=\"2266\" data-end=\"2295\"><span role=\"text\"><strong data-start=\"2270\" data-end=\"2295\">a. Product Complexity<\/strong><\/span><\/h3><ul data-start=\"2296\" data-end=\"2439\"><li data-section-id=\"wpym4r\" data-start=\"2296\" data-end=\"2368\">Intricate designs, thin walls, and undercuts require complex tooling<\/li><li data-section-id=\"1tyjfd1\" data-start=\"2369\" data-end=\"2439\">Multi-cavity moulds increase initial cost but reduce per-unit cost<\/li><\/ul><h3 data-section-id=\"e5eops\" data-start=\"2441\" data-end=\"2479\"><span role=\"text\"><strong data-start=\"2445\" data-end=\"2479\">b. Surface Finish Requirements<\/strong><\/span><\/h3><ul data-start=\"2480\" data-end=\"2609\"><li data-section-id=\"1j58z3l\" data-start=\"2480\" data-end=\"2542\">Cosmetic products demand high-gloss or decorative finishes<\/li><li data-section-id=\"48bzst\" data-start=\"2543\" data-end=\"2609\">Polishing and texturing significantly increase labour and time<\/li><\/ul><h3 data-section-id=\"vq85cq\" data-start=\"2611\" data-end=\"2643\"><span role=\"text\"><strong data-start=\"2615\" data-end=\"2643\">c. Mould Size and Weight<\/strong><\/span><\/h3><ul data-start=\"2644\" data-end=\"2764\"><li data-section-id=\"9b7lba\" data-start=\"2644\" data-end=\"2702\">Larger moulds require more material and machining time<\/li><li data-section-id=\"1t1el52\" data-start=\"2703\" data-end=\"2764\">Heavier moulds increase handling and transportation costs<\/li><\/ul><h3 data-section-id=\"hzdnjb\" data-start=\"2766\" data-end=\"2794\"><span role=\"text\"><strong data-start=\"2770\" data-end=\"2794\">d. Production Volume<\/strong><\/span><\/h3><ul data-start=\"2795\" data-end=\"2934\"><li data-section-id=\"w7l37n\" data-start=\"2795\" data-end=\"2871\">High-volume production justifies durable (and expensive) mould materials<\/li><li data-section-id=\"uuhlnp\" data-start=\"2872\" data-end=\"2934\">Low-volume moulds may use softer, cost-effective materials<\/li><\/ul><h3 data-section-id=\"1waq6jn\" data-start=\"2936\" data-end=\"2960\"><span role=\"text\"><strong data-start=\"2940\" data-end=\"2960\">e. Type of Mould<\/strong><\/span><\/h3><ul data-start=\"2961\" data-end=\"3082\"><li data-section-id=\"c2iur7\" data-start=\"2961\" data-end=\"2994\">Single cavity vs multi-cavity<\/li><li data-section-id=\"a8qf7e\" data-start=\"2995\" data-end=\"3024\">Hot runner vs cold runner<\/li><li data-section-id=\"17r66ru\" data-start=\"3025\" data-end=\"3082\">Stack moulds (higher cost but increased productivity)<\/li><\/ul><hr data-start=\"3084\" data-end=\"3087\" \/><h3 data-section-id=\"16bjoas\" data-start=\"3089\" data-end=\"3122\"><span role=\"text\"><strong data-start=\"3092\" data-end=\"3122\">3. Cost Estimation Methods<\/strong><\/span><\/h3><h3 data-section-id=\"1z0w8c0\" data-start=\"3124\" data-end=\"3162\"><span role=\"text\"><strong data-start=\"3128\" data-end=\"3162\">a. Experience-Based Estimation<\/strong><\/span><\/h3><ul data-start=\"3163\" data-end=\"3250\"><li data-section-id=\"b838lq\" data-start=\"3163\" data-end=\"3217\">Based on historical data and similar past projects<\/li><li data-section-id=\"50flk8\" data-start=\"3218\" data-end=\"3250\">Quick but may lack precision<\/li><\/ul><h3 data-section-id=\"1gttim1\" data-start=\"3252\" data-end=\"3287\"><span role=\"text\"><strong data-start=\"3256\" data-end=\"3287\">b. Feature-Based Estimation<\/strong><\/span><\/h3><ul data-start=\"3288\" data-end=\"3359\"><li data-section-id=\"1qcjvh1\" data-start=\"3288\" data-end=\"3359\">Cost calculated based on part features (size, complexity, cavities)<\/li><\/ul><h3 data-section-id=\"581pjk\" data-start=\"3361\" data-end=\"3400\"><span role=\"text\"><strong data-start=\"3365\" data-end=\"3400\">c. Activity-Based Costing (ABC)<\/strong><\/span><\/h3><ul data-start=\"3401\" data-end=\"3507\"><li data-section-id=\"1ftaxk1\" data-start=\"3401\" data-end=\"3450\">Detailed breakdown of each manufacturing step<\/li><li data-section-id=\"1od8q51\" data-start=\"3451\" data-end=\"3507\">More accurate and widely used in professional setups<\/li><\/ul><h3 data-section-id=\"1wislz8\" data-start=\"3509\" data-end=\"3545\"><span role=\"text\"><strong data-start=\"3513\" data-end=\"3545\">d. Software-Based Estimation<\/strong><\/span><\/h3><ul data-start=\"3546\" data-end=\"3632\"><li data-section-id=\"1wc2e7e\" data-start=\"3546\" data-end=\"3581\">Use of ERP and costing software<\/li><li data-section-id=\"4qmdc9\" data-start=\"3582\" data-end=\"3632\">Integration with CAD\/CAM systems for precision<\/li><\/ul><hr data-start=\"3634\" data-end=\"3637\" \/><h3 data-section-id=\"1thjhoe\" data-start=\"3639\" data-end=\"3693\"><span role=\"text\"><strong data-start=\"3642\" data-end=\"3693\">4. Sample Cost Breakdown (Typical Distribution)<\/strong><\/span><\/h3><div class=\"TyagGW_tableContainer\"><div class=\"group TyagGW_tableWrapper flex flex-col-reverse w-fit\" tabindex=\"-1\"><table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"3695\" data-end=\"4095\"><thead data-start=\"3695\" data-end=\"3745\"><tr data-start=\"3695\" data-end=\"3745\"><th class=\"\" data-start=\"3695\" data-end=\"3723\" data-col-size=\"sm\">Cost Component<\/th><th class=\"\" data-start=\"3723\" data-end=\"3745\" data-col-size=\"sm\">Approx. Percentage<\/th><\/tr><\/thead><tbody data-start=\"3796\" data-end=\"4095\"><tr data-start=\"3796\" data-end=\"3845\"><td data-start=\"3796\" data-end=\"3824\" data-col-size=\"sm\">Material<\/td><td data-start=\"3824\" data-end=\"3845\" data-col-size=\"sm\">30\u201340%<\/td><\/tr><tr data-start=\"3846\" data-end=\"3895\"><td data-start=\"3846\" data-end=\"3874\" data-col-size=\"sm\">Machining<\/td><td data-start=\"3874\" data-end=\"3895\" data-col-size=\"sm\">25\u201335%<\/td><\/tr><tr data-start=\"3896\" data-end=\"3945\"><td data-start=\"3896\" data-end=\"3924\" data-col-size=\"sm\">Design &amp; Engineering<\/td><td data-start=\"3924\" data-end=\"3945\" data-col-size=\"sm\">10\u201315%<\/td><\/tr><tr data-start=\"3946\" data-end=\"3995\"><td data-start=\"3946\" data-end=\"3974\" data-col-size=\"sm\">Assembly &amp; Fitting<\/td><td data-start=\"3974\" data-end=\"3995\" data-col-size=\"sm\">5\u201310%<\/td><\/tr><tr data-start=\"3996\" data-end=\"4045\"><td data-start=\"3996\" data-end=\"4024\" data-col-size=\"sm\">Finishing &amp; Polishing<\/td><td data-start=\"4024\" data-end=\"4045\" data-col-size=\"sm\">10\u201315%<\/td><\/tr><tr data-start=\"4046\" data-end=\"4095\"><td data-start=\"4046\" data-end=\"4074\" data-col-size=\"sm\">Trials &amp; Testing<\/td><td data-start=\"4074\" data-end=\"4095\" data-col-size=\"sm\">5\u201310%<\/td><\/tr><\/tbody><\/table><\/div><\/div><hr data-start=\"4097\" data-end=\"4100\" \/><h3 data-section-id=\"1izslk9\" data-start=\"4102\" data-end=\"4140\"><span role=\"text\"><strong data-start=\"4105\" data-end=\"4140\">5. Cost Optimization Strategies<\/strong><\/span><\/h3><ul data-start=\"4142\" data-end=\"4582\"><li data-section-id=\"fns4nq\" data-start=\"4142\" data-end=\"4222\"><strong data-start=\"4144\" data-end=\"4167\">Design Optimization<\/strong>: Simplify part geometry to reduce tooling complexity<\/li><li data-section-id=\"1vin658\" data-start=\"4223\" data-end=\"4277\"><strong data-start=\"4225\" data-end=\"4244\">Standardization<\/strong>: Use standard mould components<\/li><li data-section-id=\"vi87sd\" data-start=\"4278\" data-end=\"4366\"><strong data-start=\"4280\" data-end=\"4302\">Material Selection<\/strong>: Choose cost-effective materials without compromising quality<\/li><li data-section-id=\"133o3lr\" data-start=\"4367\" data-end=\"4440\"><strong data-start=\"4369\" data-end=\"4383\">Automation<\/strong>: Reduce manual intervention in machining and polishing<\/li><li data-section-id=\"bmnzma\" data-start=\"4441\" data-end=\"4517\"><strong data-start=\"4443\" data-end=\"4471\">Efficient Cooling Design<\/strong>: Reduce cycle time and improve productivity<\/li><li data-section-id=\"l0o4mr\" data-start=\"4518\" data-end=\"4582\"><strong data-start=\"4520\" data-end=\"4555\">Preventive Maintenance Planning<\/strong>: Avoid costly breakdowns<\/li><\/ul><hr data-start=\"4584\" data-end=\"4587\" \/><h3 data-section-id=\"1yc4x7e\" data-start=\"4589\" data-end=\"4628\"><span role=\"text\"><strong data-start=\"4592\" data-end=\"4628\">6. Challenges in Cost Estimation<\/strong><\/span><\/h3><ul data-start=\"4630\" data-end=\"4821\"><li data-section-id=\"ud66bp\" data-start=\"4630\" data-end=\"4657\">Frequent design changes<\/li><li data-section-id=\"10g0u27\" data-start=\"4658\" data-end=\"4692\">Unclear product specifications<\/li><li data-section-id=\"mh0vwt\" data-start=\"4693\" data-end=\"4738\">Underestimation of finishing requirements<\/li><li data-section-id=\"1h2nfsg\" data-start=\"4739\" data-end=\"4777\">Variability in raw material prices<\/li><li data-section-id=\"pj2qem\" data-start=\"4778\" data-end=\"4821\">Trial-and-error during mould validation<\/li><\/ul><hr data-start=\"4823\" data-end=\"4826\" \/><h3 data-section-id=\"nv9yv3\" data-start=\"4828\" data-end=\"4848\"><span role=\"text\"><strong data-start=\"4831\" data-end=\"4848\">7. Conclusion<\/strong><\/span><\/h3><p data-start=\"4850\" data-end=\"5237\">Cost estimation for cosmetic mould manufacturing requires a balance between precision, quality, and efficiency. Since cosmetic products demand superior aesthetics and tight tolerances, detailed planning and accurate costing methods are essential. A well-prepared cost estimate not only ensures profitability but also builds trust with clients through transparent and competitive pricing.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-b26a063 e-flex e-con-boxed e-con e-parent\" data-id=\"b26a063\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a85f640 elementor-widget elementor-widget-image\" data-id=\"a85f640\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"450\" height=\"285\" src=\"https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/22-2.webp\" class=\"attachment-large size-large wp-image-6099\" alt=\"\" srcset=\"https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/22-2.webp 450w, https:\/\/mouldzone.com\/blog\/wp-content\/uploads\/2026\/04\/22-2-300x190.webp 300w\" sizes=\"(max-width: 450px) 100vw, 450px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Cost estimation is a critical phase in cosmetic mould manufacturing, as it directly impacts pricing, profitability, and project feasibility. Accurate estimation ensures efficient resource allocation, competitive quotations, and controlled production costs. 1. Key Components of Cost Estimation a. Design and Engineering Costs Product design analysis and feasibility study 3D modelling and CAD development Mold flow [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6099,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6096","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-other"],"_links":{"self":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts\/6096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/comments?post=6096"}],"version-history":[{"count":4,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts\/6096\/revisions"}],"predecessor-version":[{"id":6102,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/posts\/6096\/revisions\/6102"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/media\/6099"}],"wp:attachment":[{"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/media?parent=6096"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/categories?post=6096"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mouldzone.com\/blog\/wp-json\/wp\/v2\/tags?post=6096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}